Asphalt Production Plant - All Rounder

Job No: 102374
Location: Laverton North, Melbourne

  • Loads of overtime
  • Full training provided
  • $27.71 per hour + $23.50 daily allowance

Our Company

The Alex Fraser Group is engaged in construction and demolition materials recycling and asphalt production and paving. We operate five facilities in Melbourne, two in Brisbane and employ around 270 people. The role is based at Laverton North.

Our Culture

The work you do with us matters. Every day, you will play an important part in sustaining our environment. At Alex Fraser, we transform mountains of rubble into high-grade civil construction materials, recovering these precious resources and dramatically reducing the carbon footprint of major projects. Join us and do good work.

About the Opportunity

We have a great opportunity to enter Australia’s leader in the sustainable use of recycled materials in asphalt production. Alex Fraser Group are currently staffing a state-of-the-art, purpose built asphalt manufacturing facility in Laverton North, which will be Australia’s largest asphalt production plant.

This is a multi-skilled team environment so you will also pitch in and learn the wheel loader, laboratory and dispatch. Full training and tickets will be provided.

6am to 4pm, six days a week. Your earning potential is high with lots of overtime and Saturdays. Regular weekend and night shift work is required so flexibility and a strong team work ethic are essential.

In return, you will earn a base rate of $27.71 as well as a Daily Allowance of $23.50 and a monthly RDO.

For a confidential discussion please call Jade Ritchie 0484 010 682. No Agencies please.

To apply please fill out the form below.

Apply Now

Personal Details * Required field

  1. Digits only or add + for international numbers

  1. (Please click on your profile and copy the URL from your profile page.)